No CLIENT’S NAME DESCRIPTION OF PROJECT/WORK DATE OF COMPLETION
1 Syamiras Sdn Bhd Chemical Cleaning for Tower T-7501 at BASF April 2007
2 Process 3 Services Sdn Bhd Supply, Delivery & Execute De-contamination Works at Crude Distillation Unit (CDU) KR1, Petronas Penapisan Terengganu Sdn Bhd August 2007
3 Process 3 Services Sdn Bhd Supply, Delivery & Execute De-contamination
Works for hydrocarbon and mercury at Crude Fractioning Unit (CFU) KR2, Petronas Penapisan Terengganu Sdn Bhd
28 August 2007 – 1 September 2007
4 Process 3 Service & Solution Sdn Bhd. Mercury Decontamination Works for Daily
Maintenances Activities and Turnaround at Plant
Operation Division (POD) Petronas Gas Berhad.
August 2008 – December 2010
5 Process 3 Services Solution Sdn Bhd Mercury monitoring & Deconatamination work during turnaround at GPP 4, Petronas Gas Berhad Nov 2008
6 Danforth Petroleum Industries Sdn Bhd Provision to Supply Chemical for pilot project to break clogging for Penara pipeline, Petronas Carigali Sdn Bhd October 2009
7 Primier Viable Sdn Bhd Supply of Deoiler for Baram platform, Petronas Sarawak operation 10 December 2009 – 15 January 2010
8 Process 3 Services and Solution Sdn Bhd Provision of Decontamination services for Quench Tower System, Optimal Olefin Sdn Bhd 1 April 2009 – 31 May 2009
9 Wizacorp Sdn Bhd Provision of chemical cleaning for services pipeline at cutting workshop, MMHE February 2009-March 2009
10 Process 3 Services Solution Sdn Bhd Mercury monitoring & Deconatamination work during turnaround at KCS & DPCU-2, Petronas Gas Berhad. Jan – Feb 2009
11 Special Triump Sdn Bhd Provision of chemical cleaning and pigging work for services pipeline (oxygen & ecethylene) at MMHE 08 January 2010 – 18 January 2010
12 Process 3 Services Solution Sdn Bhd Mercury Decontamination work during Petronas Penapisan Terengganu Sdn Bhd, CDU shutdown April 2010 March/April 2010
13 Bumihiway Sdn Bhd Reparing GRE pipe and pigging work at TUDM, Gong Kedak, Besut, Terengganu March 2010
14 Process 3 Services Solution Sdn Bhd Decontamination work during Petronas Penapisan Terengganu Sdn Bhd, CFU shutdown April 2010 April 2010
15 Skycom Enterprise Relocation of CNG station and piping work for Universiti Malaysia Pahang April 2010
16 Baling Bayu Engineering Sdn Bhd Spool fabrication for Petronas Gas Berhad May 2010
17 Process 3 services solution Sdn Bhd Decontamination work for benzene column and their system during Petronas Penapisan Terengganu Sdn Bhd minishutdown May 2010. May 2010
18 Bumihiway (M) Sdn Bhd Jet Fuel Tank calibration at TUDM, Gong Kedak, Besut, Terengganu. May 2010
19 Khozanuum Sdn Bhd Piping Installation, Cleaning and commissioning at Rapid Penang. Jun 2010
20 Dynaciate Engineering Sdn Bhd Pipeline cleaning and pigging work for MMHE ATB Workshop at Pasir Gudang Jun 2010
21 Process-3 services Solution Sdn Bhd Chemical Cleaning for Pig Receiver at Resak Platform Feb 2011
22 Khozzanuum Sdn Bhd Fabrication of aboveground skid tank (2200IG) Sep 2010 – Mar 2011
23 Process-3 Services Solution Sdn Bhd Decontamination work for hydrocarbon and mercury during PPTSB TANP 2011 April 2011
24 Petronas Fertilizer Rental of circulation pump September 2012
25 Process 3 services Solution Sdn Bhd Supply of injection pump November 2012
26 Entrepose Asia Sdn. Bhd Supply Of Chemical (Delutra 500) December 2012
27 Casa Armada Sdn Bhd Chemical cleaning for Analyzer at OPTIMAL August 2013
28 Seri Dinamik Engineering Sdn Bhd Vessel Cleaning and Install new level Gauge at PGB March 2014
29 Entrepose Asia Sdn Bhd Supply of degreaser (Ultrawax 1000) August 2014
30 Seri Dinamik Engineering Sdn Bhd Transfer product from pipeline to tank September 2014
31 TMM Engineering Sdn Bhd Tank cleaning at Kemaman Bitumin Company (Tank TK 518) December 2014
32 Casa Armada Sdn Bhd Chemical cleaning for Analyzer at OPTIMAL May 2015
33 Entrepose Asia Sdn Bhd Supply 3 in 1 (BOC 500), Ultrachem 500 and DYE (Dye 500) August 2015
34 Azimat Oil Sdn Bhd Supply 3 in 1 (BOC 500), Ultrachem 500 and DYE (Dye 500) September 2015
35 Syamiras Services Sdn Bhd Supply 3 in 1 (BOC 500) September 2015
36 Entropose Asia Sdn Bhd Mercury monitoring and decontamination December 2015
37 Kemaman Bitumen Company Tank Cleaning for Wet Slop Tank (TK-507) April 2016
38 Kemaman Bitumen Company Sludge minimization May 2016-Jun 2016
39 Entrepose Asia Sdn Bhd Supply of chemical (Ultrachem 500) Jun 2016
40 Kemaman Bitumen Company Sludge Minimization August 2016
41 Kemaman Bitumen Company Crude/bitumen tank cleaning (TK-501B) December 2016
42 Entrepose Asia Sdn Bhd Supply 3 in 1 (BOC 500), Ultrachem 500(Deoiler) and DYE (Dye 500) May 2017
43 Dynamic Curve Sdn Bhd Supply 3 in 1 (BOC 500) June 2017
44 Armada Petroleum Sdn Bhd De-oiler system for FPSO and supply of 3 in 1 and de-oiler chemical. June 2017
45 Highbase Strategic Sdn Bhd Chemical Cleaning for WHRU at Dulang Platform Aug-sept 2017
46 Armada Petroleum Sdn Bhd Break Tank Rental for PipeLine Flushing at Shell Pasir Gudang. September 2017
47 Subsurf Sdn Bhd Floating Hose cleaning, Testing and repair June-September 2017
48 Armada Petroleum Sdn Bhd Deoiler System November 2017
49 Armada Petroleum Sdn Bhd Supply of chemical 2 in 1 (Oxygen Scavenger & Corrosion Inhibitor)and THPS December 2017
50 Entrepose Asia Supply of BOC 500 and DYE (DYE 500) Jan 2018
51 Dynamic Curve Water treatment Services( Oil in water separation system) for MURPHY West Patricia Project Mar 2018
52 Perfect Emerald Concentrated Sulfurid Acid Tank Cleaning by using 3D cleaning at Lynas Malaysia Sdn Bhd Apr 2018
53 Kemaman Bitumen Company Desludging for Naptha tank May 2018
54 Advance Borneo
Engineering
Supply of Chemical BOC 500, Ultrachem 500 & DYE 500 July 2018
55 Armada Petroleum Water treatment Services( Oil in water separation system) for SHELL F23 Project August 2018
56 PBH Trading & Construction Pre-Commisioning ( Cleaning, Pneumatic Testing, Swabbing & Nitrogen Packing) for Linde Malaysia Sdn Bhd November 2018
57 Highbase Strategic Provision of Internal Pipeline Chemical Cleaning for WHRU HX645 & HX647 at Dulang Offshore Platform Feb 2019
58 Advance Borneo
Engineering
Water treatment Services( Oil in water separation system) for MURPHY Oil Sarawak March 2019
59 Armada Petroleum Supply of 3in1 Chemical (BOC 500) & Fluorescent Dye 500 for Sapura/Shell March 2019
60 PBH Trading & Construction Pre-Commisioning ( Cleaning, Pneumatic Testing, Swabbing & Nitrogen Packing) for Linde Malaysia Sdn Bhd April 2019
61 Asiaflex Pump Rental – Asiaflex Sdn Bhd July 2019
62 Armada Petroleum Water treatment Services( Oil in water separation system) for NIPPON Oil Sarawak Sept 2019